Quantcast
Channel: My Nissan Leaf Forum
Viewing all articles
Browse latest Browse all 69396

Nissan To Install 500 More Quick Charge Stations

$
0
0
by Boomer23 (Posted Thu, 21 Mar 2013 17:10:52 GMT)
General Manager Mark Ranauro at Connell Nissan in Costa Mesa, CA, posing with the pad and switch box for his long hoped-for DCQC. There are three parking spaces that will be designated for DCQC parking. The location is separated from the Level 2 AV EVSEs that are located directly in front of the showroom.



Viewing all articles
Browse latest Browse all 69396

Trending Articles