by wwhitney (Posted Sat, 24 Aug 2013 20:00:19 GMT)
If you have one piece of cord-and-plug connected utilization equipment (the EVSE) and want to install one circuit with two receptacles, so you can move your
equipment between the two locations, that's fine and allowed by the NEC.
Cheers, Wayne
planet4ever wrote:
By "two outlets" do you mean two receptacles? i.e. two places you can plug something into? I don't think you are supposed to do that on a single circuit
If you have one piece of cord-and-plug connected utilization equipment (the EVSE) and want to install one circuit with two receptacles, so you can move your
equipment between the two locations, that's fine and allowed by the NEC.
Cheers, Wayne